SiteTwin · construction progress monitoring

Your site, every fortnight,
in 4D.

We fly the same waypoints on a fixed cadence, process the data offline, and your private link updates itself: a dated timeline, before/after compare, a 3D scan you can orbit, and a report your RERA filing can use. You open a link. That's the whole job on your side.

Live demo · real client data

This is what you'd open.

Fortnightly · 20 flights · May 2023 → Aug 2024
Adani data centre, May 2023. Bare land. Boundary fenced.
Adani data centre, Jan 2024. Excavation. Site offices in.
Adani data centre, Feb 2024. Pile caps. Foundations begin.
Adani data centre, Mar 2024. Raft poured. Safety nets up.
Adani data centre, Apr 2024. Columns. First tower crane.
Adani data centre, May 2024. Ground structure across the footprint.
Adani data centre, Jun 2024. Monsoon. Structure climbing.
Adani data centre, Jul 2024. Steel framing. Second crane.
Adani data centre, Aug 2024. Decking on. Upper floors forming.
Adani data centre, Late Aug. Structure enclosed to upper levels.
Late Aug Structure enclosed to upper levels.

Demo built from two real archives. In the product each flight also adds a 3D scan (Twin tier), and a map view with measurements; this page shows one scan per site.

How it works

You never touch a drone.

  1. 01

    We fly the same mission

    Fixed waypoints, altitude and camera angles saved as a mission file, flown on your cadence — so every frame lines up with the last.

  2. 02

    We process offline

    Photogrammetry, orthomosaic, 3D scan and the report are produced on our workstations. Nothing heavy runs on your side.

  3. 03

    Your link updates

    The viewer gains a new date. Your team opens the same private link; buyers see the embedded version on your own website.

Plans

Priced per site, per month.

  • Monthly

    Record

    Plot developers · single towers

    • Monthly flight, same waypoints
    • Dated aerial timeline
    • Before / after compare
    • RERA-ready PDF each quarter
    • Private link for your team
    Price this
  • Fortnightly + engineering

    Plan

    Large sites · EPC · infrastructure

    • Everything in Twin
    • Plan / BIM overlay on the model
    • % complete per block, cut & fill volumes
    • Contractor invoice verification
    • Multi-site dashboard
    Price this

Pricing depends on site area and cadence. Tell us the plot and we quote within a day.